FCR Emergency Measures Construction Method [FCR Method Association]
Immediate emergency measures after the investigation.
When conducting an investigation of railway drainage facilities (fukubi, fusebi, fukeburi), if there are significant deformations and a risk of subsidence, prompt FCR emergency measures will be taken. Water flow will be secured to prevent track bed subsidence. Due to the compact nature of the repair equipment, repairs can be made in any location. *For more details, please download the PDF or feel free to contact us.*
- Company:FCR
- Price:Other